Sunday, August 24, 2008

FOR LATEST INFORMATION

PLEASE VISIT MY BLOG AT
http://gregornot.wordpress.com/

IT COVERS THE SAME MATERIAL. THERE IS NOT SENSE TRYING TO DECIDE WHAT TO PUT ON WHAT BLOG, SO I AM PUTTING EVERYTHING ON THE ABOVE BLOG.

THANKS FOR READ MY BLOG, HOPE TO SEE YOU ON MY WORDPRESS BLOG, GREGOR

But please read the past articles and video's especially on Corbin Harney and Shundahai Network that are located in this blog,
Kind, Regards, gregor

Wednesday, August 20, 2008

Reactors shut after checks reveal 'minor issues'

Reactors shut after checks reveal 'minor issues'
Dungeness B power station
Electricty generation at Dungeness B nuclear power station is at a standstill after routine work revealed repairs were needed to steel reactor supports.

Three-yearly maintenance checks resulted in the first reactor station being out of action for several weeks.

Problems with the steel supports were noticed and when the second reactor was checked, similar safety concerns were raised and that had to be shut down as well.

Work has also been carried out on one reactor to strengthen fuel plugs.

A spokeswoman for British Energy, which runs the power station, said “There are no safety implications – it is a question of dealing with minor issues before they become serious.

“One of the reactors was shut down as standard procedure, but repairs to the plugs took longer than originally thought.

“The other was then shut down to enable work to be carried out on the supports.

“It is unusual for both reactors to be shut down at the same time and no electricity to be generated at all.”

The company admitted it had taken a “commercial hit” because of the works.

“We have no electricity being produced and we also have to pay for the repair work,” said the spokeswoman.

“Also we have contracts with customers to supply power and so we have to buy supplies in – and we are charged a premium rate.

“We cannot say when the reactors will be back online, but it’s fair to say shortly. I think we are on the home strait.”

Monday, August 18, 2008

New round of IAEA-Iran nuclear talks kicks off

New round of IAEA-Iran nuclear talks kicks off
Tehran, Aug 18, IRNA

Iran-IAEA-Heinonen
The United Nations nuclear watchdog's deputy director general, Olli Heinonen, held talks with senior Iranian nuclear officials on Monday.

Deputy Head of Iran's Atomic Energy Organization (IAEO) Mohammad Saeedi and Iran's Permanent Ambassador to IAEA Ali Asghar Soltaniyeh were also present in the meeting.

Heinonen, arrived in Tehran early Monday upon an invitation of the IAEO.

Heinonen's previous talks with Iranian officials were held during his two-day visit to from August 7-8.

He had described his talks with senior Iranian officials as "constructive".

IAEA Director General Mohamed ElBaradei is due to present a report on Iran's nuclear program and the country's cooperation with the agency to the IAEA's Board of Governors in early September.

Sunday, August 17, 2008

Russia considers nuclear missiles for Syria, Mediterranean, Baltic

Russia considers nuclear missiles for Syria, Mediterranean, Baltic

DEBKAfile Special Report

August 17, 2008, 9:25 AM (GMT+02:00)

Russia's nuclear-capable Iskandar missile

Russia’s nuclear-capable Iskandar missile

DEBKAfile’s military sources report Moscow’s planned retaliation for America’s missile interceptors in Poland and US-Israeli military aid to Georgia may come in the form of installing Iskandar surface missiles in Syria and its Baltic enclave of Kaliningrad.

Russian Baltic and Middle East warships, submarines and long-range bombers may be armed with nuclear warheads, according to Sunday newspapers in Europe.

In Georgia, Russian troops and tanks advanced to within 30 km of Tbilisi Saturday, Aug. 15. A Russian general said Sunday they had started pulling out after president Dimitry Medvedev signed the ceasefire agreement with Georgia and president George W. Bush called again for an immediate withdrawal.

After routing Georgia over the breakaway enclaves of South Ossetia and Abkhazia, Moscow appears to be eying Poland, the Middle East, and possibly Ukraine, as the main arenas for its reprisals.

One plan on the table in Moscow, DEBKAfile’s sources report, is the establishment of big Russian military, naval and air bases in Syria and the release of advanced weapons systems withheld until now to Iran (the S-300 air-missile defense system) and Syria (the nuclear-capable 200 km-range Iskandar surface missile).

Shortly before the Georgian conflict flared, Moscow promised Washington not to let Iran and Syria have these sophisticated pieces of hardware.

The Iskander’s cruise attributes make its launch and trajectory extremely hard to detect and intercept. If this missile reaches Syria, Israel will have to revamp its anti-missile defense array and Air Force assault plans for the third time in two years, as it constitutes a threat which transcends all its defensive red lines.

Moscow’s war planners know this and are therefore considering new sea and air bases in Syria as sites for the Iskander missiles. Russia would thus keep the missiles under its hand and make sure they were not transferred to Iran. At the same time, Syrian crews would be trained in their operation.

DEBKAfile’s military sources report Syrian president Bashar Assad will be invited to Moscow soon to finalize these plans in detail.

Military spokesmen in Moscow said Saturday and Sunday that Russian military planners to started redesigning the nation’s strategic plans for a fitting response to America’s decision to install 10 missile interceptors in Poland and the war developments in Georgia.

The chairman of the Israeli Knesset foreign affairs and defense committee, Tzahi Hanegbi, spoke out strongly Sunday, Aug. 17, against treasury plans to slash the defense budget. He warned that the military faced grave confrontations in the coming year - possibly on several fronts.

Saturday, August 16, 2008

Gas Drilling Raises Water Well Concerns

Gas Drilling Raises Water Well Concerns
John Vogel jvogel@farmprogress.com
August 14, 2008

Landowners from New York to West Virginia are rubbing their hands in anticipation of potential windfalls from leasing land for natural gas drilling. And a number have already pocketed deals.

But protecting stream and groundwater quality is of equal or greater value, cautions Bryan Swistock, Penn State Extension water resources specialist. "Decades ago, we weren't careful with coal mining. And, we're still paying huge sums to clean up acid mine drainage. We need to be careful and vigilant, or we could see lasting damage to our water resources from so many deep gas wells being drilled."

Drilleers are trying to tap the Marcellus shale formation, a mile or more down. Relatively new drilling technology employs horizontal drilling and hydraulic pressure to "frack" or fracture the shale layer so trapped gas can escape.

The real risks are…

"Fracking" requires several million gallons of water for each gas well. Some wells may be fracked more than once during their active life, which might span more than a decade, says Swistock. "Where that water comes from, and what the drillers do with it when it's recovered, is a big issue.

Fracking water will also have chemical additives - formaldehyde, benzene and chromates - along with natural contaminants from deep underground when it comes back to the surface. So it needs to be collected and treated or recycled properly. Only about 70% of what's injected is recovered for recycling.

Most municipal sewage-treatment plants can't or won't accept gas-well waste fluids. Another potential hazard from gas-well wastewater is the release of radon and other naturally occurring radioactive materials, notes Swistock.

"Radioactive substances are not uncommon in Pennsylvania groundwater to begin with," he says. And, waste fluids that come with gas production also may contain high levels of salt, metals such as iron and manganese, and traces of barium, lead and arsenic. "Although highly diluted with water, the proper treatment of all gas-well waste fluids is a big issue that needs to be addressed."

Sample well water beforehand

People who live close to gas-drilling operations should have their water tested by a third-party, state-approved lab, advises Swistock. "Homeowners who have their own well or spring and are within 1,000 feet of a gas-well site are very likely to be visited by water-lab employees hired by the gas company," he says. He advises taking advantage of this free testing. Make sure to get copies of the results, which are entitled to by law.

Want to do your own testing? Swistock advises against it. "It's important to have an unbiased expert from a state-certified lab collect the samples in case the sample results are needed for legal action," he explains.

Timing of sampling is also important. Have well water tested within a few months before drilling starts. Once a company has started drilling, it's too late.

If a resident decides to test for any impacts after the drilling has occurred, that needs to be done within six months. Drillers are presumed responsible for any damage to water supplies within six months after drilling has begun.

"The regulation written into Pennsylvania's gas and oil act states that any water supply within 1,000 feet of a gas well is the driller's responsibility for six months after drilling," he says. "If there's any complaint, the driller is guilty until proven innocent. Outside the 1,000-feet distance and six-month time frame, the burden of proof shifts to the homeowner."

Note: Visitors to Ag Progress Days, Aug. 19-21 at Rock Springs, Pa., can learn more about the impacts of the deep-well natural-gas boom in Pennsylvania and have questions answered about the legal, social, economic and environmental issues associated with gas exploration and production. A special program on it will be offered daily in the Ag College theme building

A related Natural Gas Impact Area exhibit in the nearby Ag Renewable Energy Tent -- at West 10th and Main streets – features Penn State's College of Agricultural Sciences experts, who will offer advice on natural gas issues.